Unconventional  Petroleum Resources         135



































            • Case Studies: Insights into significant projects    c.  Well  Uptime  Improvement:  Several
                                                                      measures  have  been  taken  to  improve
            A.  RG(East)-CBM-2001/1:  The  CBM  Block                 well uptime. 3½” tubing was introduced
                RG(East)-CBM-2001/1,  covering  an  area  of          just above the pump to reduce HIT issues.
                approximately  500  Sq.km,  was  awarded              Moulded rod guides and tubing rotators
                to M/s Essar Oil Ltd in 2002. The block is in         were added to reduce rod failure due to
                Production  since  July  2016.  Some  of  key         torque and/or well trajectory. Blast joints
                highlights  of  the  CBM  project  in  RG(East)       have been introduced, and tungsten and
                are:                                                  liner-coated  tubing  are  being  used  to
                Drilling of more than 450 development wells.          minimize wear and corrosion. Hydraulic
                                                                      Regulated  Progressive  Cavity  Pumps
                Current production rate is 0.95 MMSCMD.               (HRPCP)  were  also  implemented  to
                                                                      improve MTBF.
                Implementation        of      technological
                advancements as:                                  d.  HVFR  (High  Viscosity  Friction  Reducer)
                                                                      has been used as it has very less residue
                a.  Advanced  Chemical  Stimulation:  Coal            as compared to Guar based linear gel to
                    fines  accumulation  near  the  wellbore          increase frac half-length as permeability
                    reduces  water  and  gas  output  and             is very low due to overburden stress.
                    leads to productivity loss and well failure
                    issues  like  rotor  locking.  To  address    e.  Planned  to  drill  Horizontal  wells  in
                    this,  surfactant  flushing  has  been            deeper, tight CBM reservoirs to address
                    implemented  to  clear  near-wellbore             permeability  challenges  which  may
                    damage, improving water mobility and              have better productivity due to greater
                    gas production. Recent flushing showed            coal seam exposure.
                    positive results, and it is planned to apply
                    this in 20% of reactive wells.                Extensive  data  acquisition  programme
                                                                  underway  in  the  deeper  area  to  identify
                b.  Microbial  techniques  to  enhance  oil       opportunities  in  deeper  CBM  to  open-up
                    recovery  by  breaking  down  organic         newer  areas  of  development  &  increase
                    materials. This technique facilitates the     reserves base.
                    microbial  communities  involved  in  the
                    dynamic  process  of  methanogenesis          The exploration of Shale gas is also underway
                    to  further  increase  the  methane           in RG(East) CBM Block.
                    production from the biodegradation of
                    coal over timescales.