Page 153 - DGH_Annual_Report
P. 153

Environmental and Regulatory Oversight in India’s ream Oil & Gas Sector         153




                As of now, 36 ESZs have been finalized, with      not  penalize  operators  for  delays  that  are
                16 under active review by State and Central       beyond their control due to local constraints.
                authorities.  This  focused  intervention  by
                DGH  has  significantly  improved  regulatory   These  tailored  measures  collectively  aim  to
                clarity  for  projects  falling  within  10  km  of   balance  environmental  stewardship  with  the
                Protected Area boundaries.                    strategic need for energy security in one of India’s
                                                              most underexplored yet resource-rich frontiers.
            8.3.9 North-East Region–Specific Provisions
                                                              8.4 Institutional Mechanisms for
            Recognizing     the    ecological    sensitivity,   Regulatory Facilitation at MoP&NG/
            biodiversity  richness,  and  logistical  challenges   DGH
            unique  to  the  North-Eastern  region  of  India,
            several targeted initiatives and policy flexibilities  To  ensure  timely  and  coordinated  regulatory
            have  been  introduced  to  facilitate  responsible  approvals for hydrocarbon projects, particularly
            hydrocarbon exploration and production in this  in  ecologically  and  administratively  sensitive
            strategic area.                                   regions, the Ministry of Petroleum and Natural
                                                              Gas  (MoP&NG)  and  the  Directorate  General  of
            •   Key provisions include:                       Hydrocarbons  (DGH)  have  instituted  several

                Establishment of North-East Hydrocarbon       robust  mechanisms.  These  initiatives  aim  to
                Coordination Cells: Dedicated coordination    enhance inter-agency coordination, strengthen
                cells have been set up within the Directorate   stakeholder engagement, and build institutional
                General of Hydrocarbons (DGH) to fast-track   capacity to address complex challenges related
                the  appraisal  and  processing  of  statutory   to Environmental and Forest Clearances.
                clearance  proposals  related  to  the  region.   8.4.1 Empowered Coordination Committees
                These  cells  serve  as  nodal  points  for  inter-  (ECCs)
                agency    coordination,   helping   reduce
                delays caused by regional complexities and  An     Empowered      Coordination    Committee
                administrative bottlenecks.                   (ECC),  chaired  by  the  Cabinet  Secretary  and
                                                              comprising representatives from key ministries
                Forest Clearance (FC) Flexibilities:  Given   including  the  Ministry  of  Environment,  Forest
                that  many  North-Eastern  states  have  high   and  Climate  Change  (MoEF&CC),  Ministry  of
                forest  cover,  special  provisions  have  been   Defence,  Department  of  Space,  and  others
                made  under  the  Forest  (Conservation)  Act   was constituted in May 2019 through a Gazette
                to  relax  compensatory  afforestation  (CA)   Notification  issued  by  MoP&NG.  The  ECC  was
                norms.                                        established  to  streamline  and  expedite  the
                    States may be allowed to undertake CA     grant of statutory approvals and clearances for
                                                              hydrocarbon projects.
                    in  non-forest  areas  or  degraded  forest
                    lands  where  suitable  forest  land  is  not   Since  its  inception,  seven  ECC  meetings  have
                    available.                                been  held,  leading  to  the  resolution  of  several


                    The  MoEF&CC  has  acknowledged  the      long-pending issues and the formulation of key
                                                              policy decisions. These efforts have significantly
                    region’s  natural  forest  richness  and
                    limited  availability  of  non-forest  land,   facilitated  the  development  of  the  oil  and  gas
                    allowing  for  customized  afforestation   sector.
                    strategies    that    support      both   8.4.2 North-East Coordination Committee
                    environmental and operational goals.      (NECC) Cell at DGH

                Extended     Timelines    for   Exploration   To fast-track regulatory clearances for Exploration
                Phases: In recognition of the terrain, climatic,   and Production (E&P) projects in the North-East
                and socio-political challenges in the region,   region of India, DGH established the North-East
                the  Ministry  of  Petroleum  and  Natural    Coordination Committee (NECC) on July 2, 2021.
                Gas  (MoP&NG),  in  coordination  with  DGH,   Operating under the Hydrocarbon Clearance Cell
                provides  additional  time  for  completing   (HCC) within DGH, the NECC collaborates with
                exploration  phase  commitments.  These       the E&P operators of NE region, North-Eastern
                region-specific  timeline  relaxations  ensure   state governments, and other stakeholders.
                that  Production  Sharing  Contracts  (PSCs)
                and  Revenue  Sharing  Contracts  (RSCs)  do  As  part  of  this  initiative,  young  professionals
   148   149   150   151   152   153   154   155   156   157   158